Kirklees Planning Portal: Applying for Planning Permission
The Kirklees Planning Portal is a virtual platform enabling project developers to submit, manage, and track planning applications in Kirklees. It also enables users to comment on other projects. Developers should be aware of potential ecological challenges when undertaking a new project development, particularly in areas which may be home to protected species.
Seeking environmental guidance is essential to ensure your project meets the necessary ecological requirements of Kirklees Council. At Collington Winter Environmental, we can guide you through the application process, guaranteeing ecological standards are met and ultimately making sure your project will align with local environmental principles and conservation efforts.
Planning applications for the Metropolitan Borough of Kirklees should be submitted through the Kirklees Council planning portal.
Kirklees Planning Portal: The Application Process
Applying for planning permission through the Kirklees Planning Portal involves several steps, including:
Preparing the application
Prepare necessary documents, including:
- Application forms (available on the Kirklees Planning Portal).
- Detailed site plans and drawings (e.g. elevations, floor plans).
- Supporting statements, such as a Design and Access Statement, ecological reports, or heritage assessments (if applicable).
- Biodiversity Net Gain proposal (which must provide a minimum of 10% improvement to the local area).
Submitting the application
- Complete the online planning application, including specific project details.
- Attach all required plans, including any supporting information.
Consultation
- If validated, the application will then be publicised on the portal.
- Relevant parties, such as neighbours and stakeholders, will be invited to provide feedback on the application.
Assessment
- A review of your application will begin, factoring in local planning policies, environmental impacts, relevant stakeholders, and public feedback.
- If necessary, the proposal may need modification to address specific environmental concerns.
- Ecological provisions will be considered, and you may need to modify your BNG proposal.
Decision making
- For straightforward applications, a council planning officer will make the final decision.
- For larger or contentious projects, the application may be brought before a planning committee for a decision.
- You will be notified of the outcome of your application in writing and on the portal.
What ecological requirements are considered for the planning permission process?
When applying for planning permission on the Kirklees Planning Portal, ecological requirements must be targeted. The most common ecological considerations include:
- Ecological Surveys – To identify any ecosystems or plants that may require extra consideration while planning your project.
- Protected Species Assessment – To assess any protected species which may need specific mitigation plans on your site, such as bats and badgers.
- Tree surveys – To determine the potential impact on the health and stability of existing trees on and around the development location.
- Biodiversity Net Gain (BNG) – It is now mandatory to ensure any new developments improve the local ecological habitat by at least 10%, either directly on-site or offsetting the requirement elsewhere.
- Landscape Surveys – Consideration must be given to the potential impact on the surrounding landscape.
- Ecological Clerk of Works – Collington Winter can delegate an ecological clerk of works to oversee any assessments with respect to protected species and BNG.
Kirklees Planning Portal: How can Collington Winter Environmental assist?
Collington Winter Environmental offers valuable expertise for developers submitting planning proposals in the North of England. Our Ecological Clerk of Works will assist with any habitat assessments or protected species surveys requested by your local council. With years of experience in the field, our team ensure that ecological requirements are met, delivering a successful outcome for both project developers and Kirklees Council.
If you are interested in our Kirklees Planning Portal services, contact us using the form below. You can also contact us via email at info@collingtonwinter.co.uk or call one of our team on 01204 939608.
Contact Us
Registered Address
23 Bark Street East, 1st Floor, Bolton, BL1 2BQ
Cambridge Office
Future Business Centre, Cambridge Campus, Kings Hedges Road, Cambridge, CB4 2HY
Leicester Office
Rutland House, 23-25 Friar Lane, Leicester, LE1 5QQ
Bristol Office
Newminster House, 27-29 Baldwin Street, Bristol, BS1 1LT
Telephone
Head Office: 01204 939 608
Dumfries Office: 01387 378208