Do I need a Biodiversity Net Gain Assessment?

Biodiversity Net Gain (BNG) is mandatory for most non-exempt development in England. It was introduced for relevant planning applications for major developments from 12 February 2024 and extended to relevant small sites from 2 April 2024. Projects within scope generally need to deliver a gain of at least 10% against the site’s pre-development biodiversity value. The application date, type of permission, site area and habitats affected can all influence whether the requirement applies.

For planning applications made on or after 6 August 2026, developments with a red-line site area of 0.2 hectares or less can qualify for an exemption if they do not affect on-site priority habitat. Other exemptions may also apply. If you intend to claim an exemption, we can advise on the habitat evidence needed to support it and flag any separate ecological survey requirements.

Nationally significant infrastructure projects follow a separate BNG regime for applicable development consent applications submitted from 2 November 2026. If you are working on an infrastructure scheme, the consent route and relevant biodiversity gain statement should be checked when scoping the assessment.

biodiversity net gain assessment

What does a BNG assessment include?

1. Review your site and proposals

We start with the red-line boundary, proposed works and any existing ecological information. A current layout helps us see where buildings, access roads, drainage and open space could affect habitats. If your design is still at concept stage, we can establish the baseline first and use it to compare layouts as they develop.

2. Survey and map the habitat on site

We identify and map the habitat on site and assess its condition where required. A survey might record grassland, hedgerows, ponds, woodland, individual trees and watercourses. We also flag features that may need a specialist assessment. An accurate baseline matters because it determines the starting value against which your proposed gains are measured. We explain any survey limitations or assumptions that could affect the calculation.

3. Calculate the number of biodiversity units

We use the statutory biodiversity metric published by the Department for Environment, Food & Rural Affairs (Defra). It uses factors such as habitat size or length, distinctiveness and condition to calculate the number of biodiversity units. Area habitats, hedgerows and watercourses are calculated separately. A gain in one category cannot make up a shortfall in another. The metric also has trading rules that affect which habitats can compensate for losses.

4. Test your layout and identify where gains can be delivered

We compare the baseline with what your layout would retain, remove, create or improve. If there is a shortfall, we explain which parts of the design are driving it and where changes could help. Keeping a hedgerow along a proposed access road, for example, may change the hedgerow calculation and reduce the amount of replacement planting needed elsewhere.

We also review whether there is enough suitable space to create or enhance habitats. A proposed species-rich grassland needs suitable growing conditions and a realistic management regime. Those details matter when comparing the benefits of a habitat proposal with the space, time and cost needed to deliver it.

Can I use the Small Sites Metric?

The Small Sites Metric is a simpler version of the statutory metric tool for eligible minor development projects. Eligibility depends on the type and scale of development and the ecological features present. We can review your plans and available habitat information to establish whether it’s appropriate or whether you need the full statutory biodiversity metric.

The choice of metric is a separate question from whether the development is exempt. A small site can still be subject to BNG, and a site subject to BNG may need the full metric. Establishing this early helps you commission the right survey and prepare the correct evidence for your application.

What if the development site falls short?

The metric results help show how much of the required gain your proposals could deliver within the development boundary. Where a shortfall remains, we can test changes such as retaining more existing habitat, changing the planting specification or improving the condition of habitats already within the layout. We can also advise on using registered off-site biodiversity units and explain which unit types the project needs.

Since 6 August 2026, eligible minor developments can consider on-site and off-site delivery together and may choose to go directly to off-site provision. Statutory biodiversity credits are a last resort. An assessment helps you compare the options before you commit land, budget or design time to a particular approach.

If you are a landowner or land manager exploring whether your land could supply off-site units, we can advise on the baseline assessment, habitat creation options and long-term management implications. Read our guide to Biodiversity Net Gain.

What will I receive for my planning application?

Depending on the agreed scope and the stage of your project, your biodiversity net gain assessment can include:

  • A baseline habitat plan and supporting survey findings.
  • A completed metric workbook showing the starting biodiversity value and, where the design is developed enough, the projected outcome.
  • A report explaining the results, assumptions and any remaining shortfall.
  • Recommendations for habitat retention, creation and enhancement, with advice on off-site units where relevant.
  • Updated calculations for agreed layout revisions or support responding to planning queries.

Local planning authorities review BNG information at different stages. Where the statutory requirement applies, the application must include minimum information such as the pre-development biodiversity value and supporting metric calculations. A more developed assessment can also show how the proposal is expected to meet its target and flag any delivery issues that need to be addressed.

Biodiversity Gain Plan and habitat management

A Biodiversity Gain Plan is generally submitted after planning permission has been granted and must be approved before development begins where the statutory biodiversity gain condition applies. It sets out how the final scheme will deliver its gains, including any registered off-site units allocated to the development. Significant on-site gains and off-site gains must generally be secured and managed for at least 30 years.

We can scope support for the Biodiversity Gain Plan and for habitat management and monitoring. This can include translating the metric’s target habitat conditions into practical requirements for establishing, maintaining and monitoring the proposed habitats.

Case study : Woodford Garden Neighbourhood, Stockport

At Woodford Garden Neighbourhood, our team prepared the BNG assessment and the ecology chapter of the Environmental Statement for a proposed residential development. The assessment considered how retaining features such as hedgerows and trees, alongside habitat creation within a proposed 16-acre nature park, could contribute to biodiversity. At outline stage, the submitted assessment projected gains of 18.08% in habitat units, 11.95% in hedgerow units and 75.20% in watercourse units based on the proposals assessed. View our case studies.

Request a Biodiversity Net Gain assessment quote

Send us the site address, a red-line boundary plan, a brief description of the proposed development and your planning timetable. If you have a draft layout, previous ecological surveys or comments from the local planning authority, include those too. We’ll advise on the scope of work, what you can expect to receive and where the assessment fits into your programme.

Speak to our team about your BNG assessment

 

Contact Us

Registered Address

23 Bark Street East, 1st Floor, Bolton, BL1 2BQ

Cambridge Office

Future Business Centre, Cambridge Campus, Kings Hedges Road, Cambridge, CB4 2HY

Leicester Office

Rutland House, 23-25 Friar Lane, Leicester, LE1 5QQ

Bristol Office

Newminster House, 27-29 Baldwin Street, Bristol, BS1 1LT

Telephone

Head Office: 01204 939 608

Dumfries Office: 01387 378208